Transit maintenance
Transit Surfacing Programs
Preventive maintenance and upgrades using equipment configured for constrained transit rights of way.

The operating challenge
Transit closures are narrow, access is constrained, and completed geometry directly affects ride quality and the operating authority's ability to reopen service.
Ironhorse delivery
Preventive track maintenance and upgrades
MKIV surfacing with the Jupiter II system
Purpose-built narrow-profile ballast regulation
Protection, geometry verification, and handback coordination
The delivery outcome
Ironhorse combines transit-specific equipment with a closure-focused operating plan intended to reduce disruption and return a smoother route.
This representative profile is based on Ironhorse's published service and equipment information. Client identities, exact locations, contract values, and private performance data are intentionally omitted.
Request a quoteFrom the project team

A Calgary LRT crossover from directly above
- 1Double crossover linking the two LRT tracks
- 2Traffic lanes coned off beside the work zone
- 3Loaders staged in the closed lane
- 4Crew and service trucks at the far switches



