Skip to main content

Grain terminal loop track

Viterra Moose Jaw Double Loop Track

Ironhorse built the 12,500-foot double loop track at Viterra's Moose Jaw grain terminal, letting it load full CPKC grain trains continuously.

Aerial view of a grain train on the completed double loop track around Viterra's Moose Jaw terminal
A grain train on the completed double loop at Viterra's Moose Jaw terminal. Ironhorse photograph.

The operating challenge

Viterra's expansion added a 12,500-foot double loop north of its century-old Moose Jaw terminal, sized for 144 high-capacity cars and three locomotives, with the new track crossing Britannia Road and running into an adjacent pasture beside an operating elevator.

Published project details

Double loop track construction north of the terminal
Track built for 144-car trains with three locomotives
Connection to the terminal's existing rail layout

The delivery outcome

The loop is in service: Ironhorse's aerial photograph shows a full train of grain cars on the completed loop beside the terminal. Published reports put Viterra's investment at about $18 million for the overall expansion, which is not Ironhorse's contract value.

Published details are taken from the linked independent record.

Request a quote