Skip to main content

Industrial switch installation

Vanscoy Switch Installations

Two new switches, grade work and track rehabilitation at an industrial plant site in Vanscoy, Saskatchewan, completed in late 2025.

Ironhorse crew and loader at a new switch in front of an industrial plant load-out in Vanscoy, Saskatchewan
Ironhorse crew and loader at a new switch, Vanscoy, late 2025.

The operating challenge

New turnouts at an operating industrial plant have to be built into existing yard track, with the grade prepared and the surrounding track brought up to standard so cars can move through the new connections.

Published project details

Two new switch installations
Grade preparation for the new turnouts
Rehabilitation of the connecting track
Rail cutting, switch assembly and fastening by an Ironhorse crew

The delivery outcome

Ironhorse posted the finished work in December 2025: two brand-new switch installs, grade work and track rehab in Vanscoy, Saskatchewan, with photos of the crew cutting rail, setting and fastening the switches, and loaders working the grade. The post does not name the plant owner or publish quantities.

Published details are taken from Ironhorse's own linked posts.

Planning a similar project?

For new turnouts at an industrial facility, bring the track plan, the turnout standard, material supply responsibilities, ground conditions, and the plant's loading schedule.

Request a bid

From the project team

Yard tracks leading toward an industrial plant load-out building in Vanscoy
Before: The plant yard tracks
Ironhorse worker cutting rail with a rail saw, sparks flying
Project: Cutting rail for the new switch
Crew assembling a new switch on fresh ties beside the plant building
Project: Assembling the switch on new ties
Two crew members fastening switch plates with hydraulic tools
Project: Fastening the switch plates
Loader with a rail-handling attachment beside a newly built switch
Project: Handling material with the loader
Loader working the grade beside the new track
Project: Grade work beside the new track
Completed switch on fresh ballast in front of the plant load-out
After: A finished switch in front of the plant

Project questions

What work did Ironhorse do in Vanscoy, Saskatchewan?

Ironhorse's December 2025 post documents two brand-new switch installations, grade work, and track rehabilitation at an industrial plant site in Vanscoy, Saskatchewan. The post does not name the plant owner or publish quantities.

What should a plant owner provide when planning new switches?

Send the track plan showing where the turnouts tie in, the switch size or the railway's turnout standard, who supplies the switch material, ground and drainage conditions, and the windows when cars can be held clear of the work.

What to bring to a similar project

Planning considerations for a new brief, based on the type of work documented here.

  • Confirm the turnout standard and who supplies switch material before bids are compared.
  • Plan grade and drainage work with the turnout so the new connection holds its geometry.
  • Schedule the tie-in around plant loading so cars can be held clear of the work area.
Plan a new turnout at an industrial facility
Project facts and source record

The project at a glance

Location
Industrial plant site, Vanscoy, Saskatchewan
Documented work
Two new switches, grade work, and track rehabilitation
Published
Ironhorse's own post, December 2025
Owner
Not named in the post

The documented record

  1. Late 2025

    Two new switches

    Crews cut rail, assembled the switches on new ties, and fastened the switch plates.

  2. December 2025

    Grade work and track rehab