New Track Construction

Industrial spurs, yard tracks, and loop tracks built from sub-ballast through commissioning.

Aerial view of new railway track construction in Western Canada

A complete field scope.

Ironhorse builds new industrial railway track across Alberta, British Columbia, Saskatchewan, and Manitoba. Work covers sub-ballast, ballast, ties, rail, turnouts, surfacing, and pre-service inspection for spurs, yards, loops, and mainline connections.

Planning a new spur or yard? Start with the owner’s guide
Industrial spurs, yard tracks, and grain loops
Sub-ballast, drainage, and ballast placement
Turnout supply and installation
Continuous welded and jointed rail construction
Final surfacing and geometry verification

What goes into the track.

Typical railway track cross-section: rail, ties, ballast, sub-ballast and subgrade12345
  1. 1Rail. Continuous welded or jointed rail, fastened to the ties through tie plates or clips.
  2. 2Ties. Timber or concrete ties hold gauge and spread wheel loads into the ballast.
  3. 3Ballast. Crushed rock that locks the ties in line and surface, and drains water away. Shoulders resist lateral movement.
  4. 4Sub-ballast. A compacted granular layer that separates ballast from subgrade and sheds water to the ditches.
  5. 5Subgrade. The prepared ground. Its strength and drainage set how long everything above stays in surface.

Typical section, not to scale. Design depths and materials follow the owner’s or connecting railway’s standards.

How the work moves.

Plan the build

Confirm standards, access, civil readiness, material staging, and the operating window.

Install the track

Coordinate subgrade, ballast, ties, rail, turnouts, welding, and production equipment.

Commission safely

Surface, inspect, document, and support the railway or owner through acceptance.

Equipment matched to scope

  • MKIV production tampers
  • Ballast regulators
  • Hi-rail excavators
  • Material handlers
  • Loaders and transport fleet

Common questions

Answers drawn from Ironhorse's published information and standard railway practice. Project specifics are confirmed in the bid.

What does Ironhorse need to quote a new spur or yard track?

A site plan or drawing, the connection point and serving railway, intended car types and traffic, the civil status of the subgrade, and target dates. Ironhorse can help define the rest, including turnout sizes, rail section, and construction sequencing.

Does Ironhorse handle the civil work?

Confirm the civil and track responsibilities in the bid scope. Identify who provides grading, drainage, prepared subgrade, ballast, materials, and final inspection.

How long does industrial track construction take?

The schedule depends on design and railway approvals, material lead times, civil readiness, site access, and available work windows. Provide a target operating date and ask for a project-specific sequence with those dependencies identified; a published project length alone cannot establish a construction duration.

What affects the cost of an industrial rail spur?

Track length and layout, turnout requirements, rail and tie specifications, earthworks and drainage, crossings, site access, material transport, and the serving railway interface all affect the budget. Request itemized scope and exclusions so track-construction prices can be compared on the same basis.

What should an owner include in a railway construction bid request?

Include drawings, intended traffic, applicable owner and railway requirements, material responsibilities, access restrictions, target dates, and inspection or handover deliverables. Ask bidders to identify assumptions, exclusions, and the approvals needed before construction can start.

Plan with evidence.

  • Aerial view of the NewCold building under construction with the graded spur alignment beside it
    Before: The facility under construction, with the spur alignment graded alongside
  • Loader working a ballast stockpile beside the new track
    Project: Moving ballast for the new track
  • Aerial view of the completed rail spur beside the NewCold building and parking lot
    After: The finished spur beside the completed facility
See the full Coaldale Industrial Rail Spur build